Thursday, October 20, 2011

And we have a control room floor!!

 Here's some pictures of the AC duct work. This bend heads into the control room
 And this one goes straight down for the live room
 Here's a shot of the apartment. Plumbing is mostly roughed in, hvac ducts are in place, the walls are up. Two windows and a sliding door need to be installed and then we're in business. Electrician should be coming in next week. With any luck we'll have four separate crews on site next week: one framing the control room, one putting in the live room floor, one replacing the siding and one roughing in the electrical upstairs. Crazy, crazy times.


No comments:

Post a Comment