Today, we installed the console.
Friday, November 30, 2012
Thursday, November 29, 2012
Things are moving fast now.
Diffusers are up.
Here are some shots of the wall process
Daniel James!
But the live room is a bit of a mess. The couches and piano showed up today.
Quite a bit more wiring was done. Plus the elco patchbays are in.
I got a glimpse at Tony's frame for the console.
The iso booths are coming together
And the kitchenette and bathroom, though definitely in last place, are well on their way.
Monday, November 26, 2012
Portrait of a crew. Perhaps one of the greatest ever.
Fabric started happening on the control room walls.
Some serious shit talking occurred.
Fresh gobos.
We built and installed the boxes to mount the speakers in, and started on the control room window.
Plus the kitchen counters went in to our apartment.
Sunday, November 25, 2012
We've been working a lot. This is a fairly current shot of the control room
Here's a quick view of the wall construction in the back of the room.
Here's the control room about two or three days ago.
And the live room yesterday
The soffits looked like this before they were covered with 705
Doesn't the cloud look pretty?
Electrical switches are going in, though the electrician hasn't been in for three days and I'm starting to panic a touch.
First we were wiring like animals up in Daniel's appartment. Here's Thom and Bevin
Hodge and Daniel on break.
And then we moved the whole operation downstairs in to the control room, and then the live room. I was there from 8 am to 11pm yesterday. I imagine today will probably be a repeat performance.
This is the very last hole we needed to put in the wall, between the machine room and the tape machines.
And finally, here are some shots of the booth treatment now that it's going up.
Subscribe to: