We've been working a lot. This is a fairly current shot of the control room
Here's a quick view of the wall construction in the back of the room.
Here's the control room about two or three days ago.
And the live room yesterday
The soffits looked like this before they were covered with 705
Doesn't the cloud look pretty?
Electrical switches are going in, though the electrician hasn't been in for three days and I'm starting to panic a touch.
First we were wiring like animals up in Daniel's appartment. Here's Thom and Bevin
Hodge and Daniel on break.
And then we moved the whole operation downstairs in to the control room, and then the live room. I was there from 8 am to 11pm yesterday. I imagine today will probably be a repeat performance.
This is the very last hole we needed to put in the wall, between the machine room and the tape machines.
And finally, here are some shots of the booth treatment now that it's going up.
No comments:
Post a Comment