Sunday, October 30, 2011

And a control room is built!






 Here's the new waste pipe for rainwater on the roof. Enough curves in that thing?

 Here's some snaps from a visit / site inspection by Minna Choi of Magik Magik Orchestra.

 Daniel and Minna
 And then.... snow. In October. Whatever, we didn't need to seal the outside of the building or anything. Wait a second.

 3/4 MDF over the top
 Here's a picture of the crawlspace left for the HVAC system. I'm glad we tore the old one out.




No comments:

Post a Comment