Monday, August 8, 2011

Things are moving now! There's some action in the space

 Here's a close up of one of the two giant hvac units for the studio. They had to bring it in through the front windows and get it out back before we put a door in.
 The HVAC guys have started running ducts through the roof.



 Here's the new dry well in the back yard. Only the last roof runs into the yard anyway and it's pretty dry back there so I'm not expecting any major flooding. Fingers crossed.
And here's a view of the second floor now that there is a floor! The second floor, just like the first is going to be 3/4" plywood, two layers of 5/8" cement board, 1" Warmboard radiant plywood flooring and engineered hardwood. Hopefully four inches of solid floor plus hanging the ceiling downstairs will be enough to let me sleep if somebody wants to play a Pete Townshend solo at four in the morning.



No comments:

Post a Comment